Projects

LOVELL STONE GROUP CHOOSES LTP PROTECTION AT WALTHAM FOREST TOWN HALL

A stunning natural stone installation, featuring a bespoke blend of Purbeck Stone paving from Lovell Stone Group, has recently been completed at Waltham Forest Town Hall in Walthamstow, East London. LTP’s ECOPROTECÒ Natural Finish Stone Sealer was specified to protect the bespoke limestone pavers, which span over 2,500 square metres. The installation was carried out by Foran Construction Ltd for Landscape Architects, Churchman Thornhill Finch and Main Contractor, ISG.

Forming part of the Town Hall Campus Transformation Programme, the natural stone installation includes a sweeping entrance and circular water feature within an expansive paved square. The Purbeck limestone, in a bush-hammered finish with a Purbeck brushed-finish border, was specified to reflect “the architectural language” of the Grade II listed Town Hall. The spectacular installation seamlessly incorporates ramps, low walls, access points and discreet fountain drainage grates.   

High performance and sustainability were key considerations for the stone’s protection. LTP’s ECOPROTECÒ Natural Finish Stone Sealer provided the protection and fulfilled all eco credentials. The water-based treatment repels stains, without changing the stone’s appearance, and allows surfaces to breathe.  It also ensures a safe application, being low odour and VOC-free.

For more information about the project, please contact:

LTP on tel. 01823 666213, email technical@ecoprotec.co.uk and visit https://ecoprotec.co.uk

Lovell Stone Group on tel. 01929 439255, email sales@lovellstone.com and visit https://www.lovellstonegroup.com

Leave a Reply

Your email address will not be published. Required fields are marked *

« Previous post «
Next post » »